View All

Please refer to the English Version as our Official Version.Return

Europe
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asia/Pacific
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Africa, India and Middle East
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
South America / Oceania
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
North America
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
HomeProductsDevelopment Boards, Kits, ProgrammersEvaluation Boards - DC/DC & AC/DC (Off-Line) SMPSLM536033EVM
LM536033EVM Image
Image may be representation.
See specifications for product details.
EXPRESS OPTION
Payment method

LM536033EVM - Texas Instruments

Manufacturer Part Number
LM536033EVM
Manufacturer
Texas Instruments
Allelco Part Number
98D-LM536033EVM
Warranty
1 Year Allelco Warranty - Find out more
Parts Description
EVALUATION MODULE
Package
Bulk
Data sheet
1.LM536033EVM.pdf ...
RoHs Status
ROHS3 Compliant
Our certification
In stock: 29513
  • Unit Price: $58.80
  • Subtotal: $0.00

Want a better price?
Add to Cart and Submit RFQ now, we'll contact you immediately.

Quantity Unit Price Ext. Price
1+ $58.80 $58.80
The above prices does not include taxes and freight rates, which will be calculated on the order pages.
EXPRESS OPTION
Payment method
Our certification

Specifications

LM536033EVM Tech Specifications
Texas Instruments - LM536033EVM technical specifications, attributes, parameters and parts with similar specifications to Texas Instruments - LM536033EVM

Product Attribute Attribute Value  
Manufacturer Texas Instruments  
Voltage - Output 3.3V  
Voltage - Input 3.9V ~ 36V  
Utilized IC / Part LM536033  
Supplied Contents Board(s)  
Series -  
Regulator Topology Buck  
Product Attribute Attribute Value  
Package Bulk  
Outputs and Type 1, Non-Isolated  
Main Purpose DC/DC, Step Down  
Frequency - Switching 2.1MHz  
Current - Output 3A  
Board Type Fully Populated  
Base Product Number LM536033  

Environmental & Export Classifications

ATTRIBUTE DESCRIPTION
RoHs Status ROHS3 Compliant
Moisture Sensitivity Level (MSL) 1 (Unlimited)
REACH Status REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Parts with Similar Specifications

The three parts on the right have similar specifications to Texas Instruments LM536033EVM

Product Attribute LM536033EVM LM53603AEVM LM536035EVM LM53602AMPWPR
Part Number LM536033EVM LM53603AEVM LM536035EVM LM53602AMPWPR
Manufacturer Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Voltage - Input 3.9V ~ 36V 3.9V ~ 36V 3.9V ~ 36V -
Current - Output 3A 3A 3A 2A
Board Type Fully Populated Fully Populated Fully Populated -
Supplied Contents Board(s) Board(s) Board(s) -
Frequency - Switching 2.1MHz 2.1MHz 2.1MHz 2.1MHz
Utilized IC / Part LM536033 LM53603A LM53635A -
Package Bulk Bulk Box Tape & Reel (TR)
Series - - - Automotive, AEC-Q100
Voltage - Output 3.3V 3.3V ~ 6V 5V -
Outputs and Type 1, Non-Isolated 1, Non-Isolated 1, Non-Isolated -
Main Purpose DC/DC, Step Down DC/DC, Step Down DC/DC, Step Down -
Regulator Topology Buck Buck Buck -
Base Product Number LM536033 LM53603 LM536035 LM53602

LM536033EVM Datasheet PDF

Download LM536033EVM pdf datasheets and Texas Instruments documentation for LM536033EVM - Texas Instruments.

HTML Datasheet
LM53602-Q1, LM53603-Q1 Datasheet.pdf

Customer Reviews

Evaluation: 10 Articles

  • Jess***Jones
    Apr 17, 2026

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    Apr 17, 2026

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    Apr 3, 2026

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    Apr 3, 2026

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    Mar 23, 2026

    Very good. No issue after long time testing.

  • Kevi***.
    Mar 17, 2026

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    Jun 16, 2024

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    Jun 19, 2024

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    Jun 19, 2024

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    Jun 19, 2024

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Write a Review

Your Email address will not be published.

Shipment

Delivery Time

In-stock items can be shipped within 24 hours. Some parts will be arranged for delivery within 1-2 days from the date all items arrive at our warehouse. And Allelco ships order once a day at about 17:00, except Sunday. Once the goods are shipped, the estimated delivery time depends on the shipping methods and Delivery destination. The table below shows are the logistic time for some common countries.

Delivery Cost

  1. Use your express account for shipment if you have one.
  2. Use our account for the shipment. Refer to the table below for the approximate charges.
(Different time frame / countries / package size has different price.)

Delivery Method

  1. Global Common Shipment by DHL / UPS / FedEx / TNT / EMS / SF we support.
  2. Others more shipping ways, please get in touch with your customer manager.

Common Countries Logistic Time Reference
Region Country Logistic Time(Day)
America United States 5
Brazil 7
Europe Germany 5
United Kingdom 4
Italy 5
Oceania Australia 6
New Zealand 5
Asia India 4
Japan 4
Middle East Israel 6
DHL & FedEx Shipment Charges Reference
Shipment charges(KG) Reference DHL(USD$)
0.00kg-1.00kg USD$30.00 - USD$60.00
1.00kg-2.00kg USD$40.00 - USD$80.00
2.00kg-3.00kg USD$50.00 - USD$100.00
Note:
The above table is for reference only. There may have some data bias for the uncontrollable factors.
Contact us if you have any questions.

Payment Support

The payment method can be chosen from the methods shown below: Wire Transfer (T/T, Bank Transfer), Western Union, Credit card, PayPal.

Your Faithful Supply Chain Partner -

Contact us if you have any questions.

  1. Phone
    +00852 9146 4856

Certifications & Memberships

View More
LM536033EVM Image

LM536033EVM

Texas Instruments
98D-LM536033EVM

Want a better price? Add to Cart and Submit RFQ now, we'll contact you immediately.

0 RFQ
Shopping cart (0 Items)
It is empty.
Compare List (0 Items)
It is empty.
Feedback

Your feedback matters! At Allelco, we value the user experience and strive to improve it constantly.
Please share your comments with us via our feedback form, and we'll respond promptly.
Thank you for choosing Allelco.

Subject
E-mail
Comments
Captcha
Drag or click to upload file
Upload File
types: .xls, .xlsx, .doc, .docx, .jpg, .png and .pdf.
Max file size: 10MB